Visual Guide

1.

Install center pole

Install center pole

2.

Slide treads over pole

Slide treads over pole

3.

Position top landing onto pole and secure to deck

Position top landing onto pole and secure to deck

4.

Attach spindles to each tread

Attach spindles to each tread

5.

Pull handrail into spiral shape

Pull handrail into spiral shape

6.

Attach handrail to top spindle

Attach handrail to top spindle

7.

Attach all spindles to handrail

Attach all spindles to handrail

8.

Attach and secure landing railing

Attach and secure landing railing

9.

Attach Trex board to each riser from underneath

Attach Trex board to each riser from underneath

10.

Lay out and attach Trex landing

Lay out and attach Trex landing

Notes

  • Heavy duty treads and landing are welded to a round collar that precisely slides over the 3-1/2” diameter center pole.
  • Ships with a 10” x 1/4” thick round metal base plate with pre-drilled holes for bolting to landing pad.
  • Unique lip-up tread design for added strength and safety.
  • Treads and landing are pre-drilled to receive Trex tread board.
  • Railing spindles have an adjustable cup-shaped handrail connector for a precise fit.
  • 25-year limited warranty.
  • Standard kits are furnished with 10 to 16 risers to fit floor-to-floor heights from 7’2” to 12’8”. Non-standard kits can be ordered for other heights.
  • Can be ordered for right-hand or left-hand up configuration.
  • Normal assembly time is six to eight hours using just a few simple tools.
  • Compliant with the Wildland-Urban Interface and California State and San Diego County fire code.
  • Treads and landing are pre-drilled to receive Trex tread board.